
Saturday the 11th of April. First full day of the remodel. Fifty-nine to go. Today I removed the rest of the kitchen cabinets and put them outside for the same woman who bought our dining room set to take. Cut and capped the water lines to the downstairs bathroom and kitchen, and started to demo the kitchen. We also moved the last pieces of furniture into our new "living room". Lisa spent time moving stuff out of the work zone.

Picture of the Rinnai Tankless I installed in our laundry room. We have been using it for about a month and have been pleased with the heater itself.
To the right is a picture taken along the front of the house. The string line in the front of the picture will be the eventual front line of the house. The picture shows the excavations for footers, which should be poured next week.

The picture to the left is looking at the west end of our house (the front of the house is to the left). The big hole in the ground will be our future cistern/root cellar. Both it and the actual house will extend out to the end of the screen porch and tie into the porch (so the north side of the screen porch will actually be a wall).
Where is the new front door gonna be?
ReplyDelete