Finally we could take the tarps down and Todd could work without a tent in the way. This is the back wall (along the dining room, kitchen and bathroom side). The beam you can see is a test beam so that Todd knows how to cut the rafters. They'll go in tomorrow.
Yesterday was dry enough to pour the concrete and finally finish the footers. Here you see the future front of the house. The short wall facing us will be the front doorstep, reached after you walk past Miles and Sprout's room.
This is the other part of the pour--the cistern finally has 4 walls (and does hold water already, even without waterproofing)
This is a shot of the living area south-facing windows. The area of the windows is about double what we had previously, so we should get much better natural light. The windows on the left will open into the dining room, the right will open over the sink in the kitchen.


No comments:
Post a Comment